This 100.4 KW/DC system was installed to reduce energy consumption at the Jefferson Square shell complex built for Lovelace. OE solar worked with the electrical contractors, general contractors, and owners to ensure a quick and safe installation. The 310 solar modules, Unirac ballast bays and blocks were installed in 3 days. Permitting went through the City of Albuquerque, and interconnection was coordinated with PNM.
Projected Completed: 2017
Annual Production: 228 MWh
Type: Ballast Roof Mount