This 100.4 KW/DC system was installed to reduce energy consumption at the Jefferson Square shell complex built for Lovelace. OE solar worked with the electrical contractors, general contractors, and owners to ensure a quick and safe installation. The 310 solar modules, Unirac ballast bays and blocks were installed in 3 days. Permitting went through the City of Albuquerque, and interconnection was coordinated with PNM.

Project Summary

Projected Completed: 2017
Annual Production: 228 MWh
Type: Ballast Roof Mount

 

Download white paper
Solar PV System
  • 100.4 KW/DC
  • 309 – 325 Watt Canadian Solar Tier One Modules
  • 2 – 50 kW – ABB Trio Tier One Inverter
Average Solar Production
  • 228 MW/AC a year
  • 19 MW/AC a month
  • 4.36 MW/AC a week
Racking
  • Unirac Ballast Mount
  • Azimuth- 180
  • Shading – 0%
  • Fixed Tilt – 10 Degree
By osceolaenergy
April 27th, 2022
EO Solar is proud and thrilled to have sponsored NAIOP-NM in staging their annual student science fair and contributing to the education and advanceme
By osceolaenergy
March 28th, 2022
OE Solar Commercial and Government Solar EPC